CentraState Medical Center
Project: KDC Solar CentraState I
System Size: 6.317 MW
System Type: Post driven ground mounted
Interconnection: Net-metered with JCP&L
Location: Freehold, NJ
The CentraState project is a fixed ground mounted system built on land leased by KDC Solar Middlesex 3 LLC and achieved commercial operations in October 2014. The solar facility is directly interconnected with the hospital infrastructure and provides power to the not-for-profit healthcare facility. In addition to providing clean, renewable energy to CentraState, this solar facility offsets a carbon dioxide equivalent of 6,314 tons annually.
CentraState Medical Center
Operational Vitals
Location: Freehold, NJ
Client: CentraState Medical Center Inc.
Contractor: Torcon, Inc.